You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Prosta Tower, Poland

Apie projektą

Objekto vieta: Warsaw, Lenkija

Building in the city centre of Warsaw with striking concrete and glass façade 

  • height: 70 m
  • storeys: 19
  • shell construction period: 11 months
  • construction period until opening: 2007 – 2011

Rangovo poreikiai

  • fabrication of a lozenged reinforced concrete structure in perfect fair-faced concrete situated in the front
  • limited storage capacities
  • jobsite installation with only one crane
  • high degree of reinforcement
  • concrete pressure 90 kN/m²

Rangovas

Warbud S.A., Warsaw

Kliento gautos naudos

  • anchor-less surface finish
  • mostly joint-less concrete surface
  • no subsequent surface treatment
  • utilisation of rentable system parts
  • optimised geometrical adjustment of shoring and work scaffold
Prosta Tower - Rafał Rusek, Project leader
Rafał Rusek
Project leader

This project was a great challenge for us because fair-faced concrete jobsites often mean a lot of risks. However, with PERI we have found a proficient and experienced partner. This enabled us to safely and successfully implement the project due to PERI’s perfect logistics and prefabricated formwork.

PERI sprendimai

  • logistics exactly adjusted to the construction sequence
  • a work scaffold continuously growing with the construction progress, based on the PERI UP Rosett modular-type scaffolding system
  • TRIO element layout with compensation walers
  • prefabricated box-outs, designed for the project, for moulding which is accurate to the millimetre, delivered to the jobsite ready-for-use