You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Gravity dam Barrage Koudiat Acerdoune, Algeria

Apie projektą

Objekto vieta: Koudiat Acerdoune, Alžyras

  • height: 120m
  • length: 493m
  • construction period: 2002 – 2008
  • capacity: 640,000,000 m³
  • structure: RCC gravity dam

Rangovo poreikiai

  • system that can be handled easily and flexibly
  • delivery of enormous amounts of formwork

Rangovas

Razel Algérie

Kliento gautos naudos

  • flexible adjustment of the systems to different requirements
Roger Dunand-Chatellet | Jean-Claude Mogno
Leading construction manager | Construction manager

PERI planned and supplied the complete formwork and scaffolding solution for the implementation of the dam. It was always possible to flexibly adjust the systems, which were used, to the particular pouring section and the different requirements.

PERI sprendimai

  • TRIO side formwork for layer-by-layer placement of the rolled concrete
  • single-sided SKS climbing formwork solution for the 2 m thick structural concrete layer with pouring cycle heights of 2.40 m
  • horizontally used brace frames at the run-off channel