Tošanovice-Žukov Bridge, Czech Republic

Apie projektą

Objekto vieta: Ostrava, Čekija

Design: steel composite bridge
Length: 720 m

Rangovo poreikiai

The strut axes open out from 6.50 m to 9.00 m in the centre of the bridge.

Rangovas

Metrostav a.s., Division 4, Prague

Kliento gautos naudos

  • flexible connecting possibilities for steel walers, scaffold tubes, heavy-duty spindles and tie rods
  • can be adapted to various main beam spacings
Martin Šimek, Site Manager
Martin Šimek
Site Manager

The erection of steel composite bridges is considerably easier and much faster with the PERI formwork carriage construction.

PERI sprendimai

Two modular formwork carriages from the VARIOKIT system