Lötschberg Tunnel, Switzerland
Apie projektą
Objekto vieta: Mitholz, Šveicarija
35 km railway tunnel in mining construction technique. The mining-type tunnel driving with a total of almost 16 million tons of excavated material was carried out with tunnel drilling machines (20%), and 80% was blown up.
Construction time until commissioning: 1999 - 2007
Rangovo poreikiai
Tunnel cross section of a width of 15.74 m and a height of 12.54 m
Rangovas
Schweizer Alp Transit Consortium (SATCO)
Kliento gautos naudos
Adaptable tunnel modular construction kit suitable for the jobsite
Albin Matschek
Site Supervisor
PERI offered the most efficient solution for our jobsite. The adaptable PERI modular construction kit for the jobsite with pre-assembled units excellently fulfilled all our requirements.
PERI sprendimai
- one tunnel formwork carriage for wall and slab
- hydraulically operated formwork carriage structure
- formwork carriage mobile via chain block
- hydraulic lifting components for height adjustment