Motorway bridge over the Rio Sordo, Vila Real, Portugal - Up to 30 m high VARIOKIT VST heavy-duty shoring towers served as falsework for the construction of the bridge edge sections. Each leg carried a load of around 600 kN.

Shoring & Reinforcement

These systems are designed to provide additional support and stability to the scaffolding, ensuring the safety of workers and the integrity of the structure. Shoring systems are used to support the weight of the structure, while reinforcement systems are used to strengthen and stabilize the scaffolding. These systems are commonly used in construction and maintenance projects where scaffolding is required for access to high or hard-to-reach areas.

Domitės mūsų produktais?

Paskambinkite mums numeriu +370 5 232 2550, kad galėtume aptarti jūsų reikalavimus išsamiau.