MAXIMO in use on the ROM Dome Tunnel
MAXIMO provides time-saving forming with MX tie technology as well as the best concrete finishes for wall formwork.<br/>

MAXIMO

Developed by PERI, the MX tie technology with one-sided tie installation greatly accelerates formworking operations. At the same time, MAXIMO is significantly faster than conventional wall formwork despite the lower site personnel requirements.

Domitės mūsų produktais?

Paskambinkite mums numeriu +370 5 232 2550, kad galėtume aptarti jūsų reikalavimus išsamiau.